2. CENTRAL VALUATION COMMITTEE

VALUATION RELATING TO BUILDINGRATES


NotificationNo.CVC-01/2014-15, dated 07-10-2014


Sl.No

 

Type of Building

 

Ground Floor

 

First Floor

 

Rs. Per

Sq.Ft

Rs. Per

Sq.Meter

Rs. Per

Sq.Ft

Rs. Per

Sq.Meter

1.

RCC, Sheet, Brick Wall, Granite, Flooring/ Teak Wood Windows

1600

17222

1500

16146

2.

RCC, Sheet, Concrete/Brick Wall, Marble, Flooring/ Teak Wood Windows

1530

16469

1480

15931

3.

RCC, Sheet, Concrete/Brick Wall, Mosaic/ Vitrified/ Ceramic Flooring/ Honnewood Windows

1370

14747

1200

12917

4.

RCC, Sheet, Concrete/Brick Wall, Mosaic/ Polished/ Shabhad Kadapa/ Batham Cheria Flooring/ Forest Wood/ Steel Windows

1280

13778

1100

11840

5.

RCC, Sheet, Concrete/Brick Wall, Redoxide Flooring/ Forest Wood/ Steel Windows

1200

12917

1050

11302

6.

Madras Tarasi/ Kadapa Tarasi, Mangalore Tiles/ Bricks/ Mud Wall/ A.C. Sheet/ Redoxide Flooring/ Forest Wood Windows

600

6458

550

5920

7.

Black  Tiles, Mud Melmuddi, Kadapa Slab Bricks/ Mud Walls/ Forest Wood Windows

550

5920

480

5167

 

Note:   1. Aboverates includes Civic amenities like drinking water, drainage and electricity

charges.

2. Underground construction (cellar, partial cellar & stilt) for parking/forvehicle

parking building rate should be calculated 66% (2/3) of the ground floorbuilding.